Template · Event planning

Event Production Timeline Template: 6 Weeks Out to Wrap

A production timeline you can copy and adapt for any event — working backward from show day, with an owner and a note on every row. The language is deliberately universal: it works whether you run AV, plan weddings, DJ, or operate booths. Everything here is free to read and use — no signup.

By OpsVuePublished 6 min read

How to use this timeline

Every row has four parts: when it happens, what happens, who owns it, and the note that explains why. Start from your event date and work backward — the offsets below are realistic defaults, not laws. A wedding with a two-month lead uses them as written; a corporate booking confirmed ten days out compresses everything into the week-of table and skips nothing. The one non-negotiable is the Owner column: a row nobody owns is a row that does not happen. If you are a company of one, every owner is you — the column still matters, because it separates the hats you wear.

4 to 6 weeks out: lock the shape

This phase turns a conversation into a commitment. Everything else in the timeline depends on the decisions made here being written down and agreed.

WhenWhatOwnerNotes
6 weeks outConfirm the booking in writing: date, venue, start and end times, headcountSalesIf the client has not accepted the current quote version, chase that before anything else
6 weeks outCollect the depositOfficeAn unpaid deposit this late is a real risk signal — treat it as one
5 weeks outVenue check: power, access, loading dock, floor or rigging limits, curfewProduction leadA ten-minute call with the venue beats every assumption
5 weeks outReserve equipment against the job and flag shortagesOpsAnything short gets substituted, sub-rented, or designed out — now, while there are options
4 weeks outBook crew or staff and pencil call timesOpsConfirm availability now; exact times can firm up later
4 weeks outOrder sub-rentals and any long-lead itemsOpsLead times are longest exactly when you need them shortest
4 weeks outDraft the run of show, version oneProduction leadIt will change — date every version so nobody works from a stale one

2 weeks out: confirm what you assumed

Everything decided a month ago has quietly drifted — headcounts, times, layouts. This phase exists to catch the drift while changes are still cheap.

WhenWhatOwnerNotes
2 weeks outReconfirm headcount, times, and layout with the clientSalesAsk directly what has changed — something always has
2 weeks outReconfirm venue logistics: load-in window, parking, elevator, security listProduction leadVenues change staff; the person who promised the dock may be gone
2 weeks outFinal crew confirmations with call timesOpsA confirmed person with a wrong time is still a no-show
2 weeks outConfirm sub-rental deliveries and pickupsOpsGet the confirmation in writing, with a contact name
2 weeks outFreeze the equipment list — later changes become change ordersProduction leadA freeze date protects the client too: it is when their event stops being a moving target
2 weeks outWalk the client through the timeline: key moments, contacts, decisions still openSalesThis call surfaces the surprises you want two weeks early
10 days outChase the remaining balance per your payment termsOfficeMoney conversations are easier before the event than after

The week of: production mode

From here, the timeline stops being a plan and becomes a checklist. Nothing new gets decided this week if you can help it — the week of is for executing decisions already made.

WhenWhatOwnerNotes
Week ofPull and prep equipment against the frozen listOpsPull against the list, not memory — see our equipment checkout checklist
Week ofTest everything that powers onOpsA thing untested is a thing assumed
Week ofPrint or share run sheets, stage plot, and the contact sheetProduction leadEveryone working the event gets the same version
Week ofExchange day-of contacts and phone numbers with the client and venueSalesThe show-day phone number is the single most valuable line on any sheet

Day before

WhenWhatOwnerNotes
Day beforeSend the final confirmation message: arrival time, contact, any last changesSalesShort, warm, specific — it prevents the 7 a.m. panic call
Day beforeCharge batteries, load media, stage the truckOpsEverything that can be done today is one less thing at 6 a.m.
Day beforeBrief the crew: timeline, roles, venue quirks, weather planProduction leadTen minutes now saves an hour of show-day questions

Show day: load-in through strike

Adapt the row labels to your world — doors might be a ceremony, a reception, or a corporate keynote. The structure holds either way: build, test, run, strike, count.

WhenWhatOwnerNotes
Load-inArrive with a buffer before the contracted window and check in with the venueCrew leadYour standard buffer, applied every time, is what makes you the reliable vendor
SetupBuild, cable, then test — in that orderCrew leadTesting while building hides which change broke what
1 hour before doorsFull run-through of every system, then stop touching thingsCrew leadProblems found now are fixable; problems found at doors are public
DoorsOne person owns the room, one person owns the equipmentAllWhen everyone owns everything, nobody owns the failure
DuringRun the plan; log every change as it happensCrew leadThe log is tomorrow's invoice defense and next month's better plan
Before overtimeConfirm any overtime with the client before it starts, not afterCrew leadAn overtime surprise on the invoice costs more than the overtime
StrikeCount equipment into cases against the manifest it went out onCrew leadStrike is where gear disappears — count it here, not at the warehouse
Load-outSweep the space, photograph it empty, confirm nothing left behindCrew leadThe photo also documents the condition you left the venue in

The day after and the week after

The event ends; the job does not. This is the phase most timelines skip, and it is where the money and the next booking live.

WhenWhatOwnerNotes
Day afterCheck equipment back in against the checkout list; flag missing and damage todayOpsSame-day counting is the difference between findable and gone
Day afterBack up any recordings, photos, or files from the eventOpsBefore anything gets reused or wiped
1-2 days afterSend the final invoice or the balance reminderOfficeInvoice while the event is still glowing in their memory
2-3 days afterSend a thank-you note and ask how it wentSalesThis message is where referrals and reviews come from
Week afterReconcile actuals against the quote: labor, sub-rentals, damage, extrasOfficeThis is how you learn whether the job made money
Week afterDebrief: one thing to fix before the next eventAllOne thing, written down, actually changes — a list of ten does not

Running this without the paper

In OpsVue, this timeline is what a workflow is: the named steps of your process, with timed steps anchored to real dates — the event date, the day a document was sent, the day the client accepted. Notify-team steps mint real tasks for named people when their boundary arrives, so "2 weeks out: reconfirm the venue" stops being a memory and becomes an assignment with a due date. The Company Calendar puts every dated thing — jobs, delivery legs, equipment windows, tasks, money due — on one grid, which is this template rendered across every event at once.

One honest boundary: client-facing messages in OpsVue are staged as drafts in an approval inbox — a person reviews and approves before anything goes out, and nothing auto-sends. The day-before confirmation still comes from you; the software just makes sure it is drafted, on time, every time. OpsVue is in early access, and the timeline above is yours to use either way.

OpsVue is operations software for rental, sales, and service teams — quotes, inventory, workflows, files, and payments in one connected system. Start a free trial →